Controls
How controls work in Volatilis GRC, from the control library to test results, and how a test round feeds risks and compliance coverage.
A control is a measure that reduces a risk or meets a requirement. The Controls section covers the control library, the test results you record for each control, and the routine that keeps tests on time.
Where controls fit
- A control reduces one or more risks. You link them on the control page.
- A control meets one or more requirements of a framework. You map them on the framework page. See Frameworks and requirements.
- A control has a test history. The newest test sets its effectiveness.
- A failed or partly passed test lowers the effectiveness of the control. See Control tests.
Pages in this section
| Page | What it covers |
|---|---|
| Controls | The control library, filters, creating and editing a control, linking risks. |
| Control tests | Recording a result and what it changes. |
| Control testing round | A step by step routine for a quarterly testing round. |
| Attestation campaign | A step by step routine to collect confirmations from people. The concepts are under Attestations. |
How control testing is recorded
Volatilis GRC records each test per control. There is no separate "testing round" object. A round is a routine you run: filter the controls that are due, record a result for each, and follow up on the failures. The workflow page shows how.
Related sections
- Risk for risks, actions and incidents.
- Compliance for coverage of requirements by effective controls.
Workflow: raise a risk
How anyone describes a risk in their own words, how it reaches the risk team, and how the team takes it, completes it and accepts or declines it.
Controls
The control library. Create controls, set who owns them, how often they run and how often they are tested, link them to risks, and see which ones are weak or overdue.