Skip to Content
Volatilis GRC Docs
Risk

Risk

The risk register, indicators, actions, incidents, capacity and quantification, and how they work together.

The Risk section is where the second line keeps the risk picture and where the first line reports on its own risks. Every page here points at the same record: the risk in the register.

The risk register with scores, owners, expected downside and the appetite flag.
The risk register with scores, owners, expected downside and the appetite flag.

What you use it for

You want toGo to
Keep the register, score risks and see what is above appetiteRisks
Keep the register current with owner reviewsRisk review cycle
Watch early warning signalsIndicators
Plan and track work that reduces a riskActions
Record what actually went wrong and what it costIncidents
Compare a bad year with the loss you can absorbCapacity and appetite
Put a loss model on a riskQuantification
See where your exposure sits on a mapLocations

Workflows

  • Risk review cycle: owners get a Risk review task when the review date arrives and update the risk directly.
  • Risk acceptance: keep a risk above appetite on the register through a formal, time-limited decision.

How the pages connect

A risk carries a score and, optionally, a loss model. Controls, indicators, actions and incidents are linked to the risk and show on its record as tabs. The loss model feeds the expected downside per year on the register and the simulation on the capacity page. Incidents calibrate the loss model. Owners update the score and the loss model on the risk when its review date arrives.

See How the modules connect for the whole picture.

On this page