Reading the charts
How to read the loss curve, the yearly histogram, the capacity charts, the heat map, the indicator trend, the test plan bar and the board report charts, with worked examples and common misreadings.
Most charts in the app show money, chance and time at once. This page explains each one: what it shows, how to read the axes and markers, a worked example with the numbers of the screenshot, the usual misreadings and what to do next. The numbers come from the demo organization and differ in yours.
Three ideas come back in every chart:
- A simulated year. The app plays a year 20,000 times with your loss models. Each play is one simulated year with a total loss, which can be zero.
- A 1 in N years loss. The loss that is exceeded in 1 simulated year out of N. "1 in 200" is the 99.5th percentile, also called value at risk (VaR) at 99.5% confidence. "1 in 20" is the 95th percentile (P95).
- The bad year. On the capacity page, the loss that is not exceeded in 99.5 of 100 simulated years. It is not a forecast and not the worst case.
Quantification charts
You find these on the Analysis tab of a risk and in the Check step of Quantify this risk. See Quantification.
The four figures

What it shows. What the risk costs in an average year and in unlucky years.
How to read it.
| Figure | Reading |
|---|---|
| Expected downside per year | The average over all simulated years, zeros included. The line below says how often events come and what one costs on average. |
| 1 in 20 years loss | The loss that is exceeded in 1 year out of 20. The line below says how many years were simulated. |
| 1 in 200 years loss | The loss that is exceeded in 1 year out of 200, with its share of your risk capacity. |
| Chance of a loss in a year | The share of simulated years with any loss. |
Worked example. Ransomware outage: the expected downside is EUR 1.2m per year. In 1 year out of 20 the loss is above EUR 7.4m, in 1 out of 200 above EUR 20.8m, which is 11.6% of your risk capacity. In 22 years out of 100 there is any loss at all. The first line says "about once in 4 years, EUR 4.9m on average".
Common misreadings.
- The expected downside is not what you lose each year. In this example 78 years out of 100 cost nothing, and the average of EUR 1.2m is a mix of those zeros and a few large years.
- "1 in 200" does not mean once every 200 years on a calendar. Each year has the same 0.5% chance, however many bad years came before.
- The 1 in 20 and 1 in 200 figures are yearly totals. They are not the size of one event. Look at the loss curve for that.
What to do next. If the 1 in 200 figure is a large share of capacity, check the inputs with a second person. Compare the numbers with your matrix rating: the Check step tells you which likelihood and impact the numbers match. Then plan a control or an action for the risk.
A year in total

In the Check step of the form this chart has the same title. In German the tab calls it Jahressumme.
What it shows. The histogram of the yearly total loss over all simulated years.
How to read it. The horizontal axis is the loss in a year, from EUR 0 up to the largest drawn value (here EUR 55.6m). Each bar counts the simulated years in that loss range. A tall bar means many years. The red dashed line is the 1 in 200 marker (here EUR 20.8m). Years without a loss are not drawn. The line under the title tells you their share: "78% of simulated years have no loss and are not drawn."
Worked example. Most drawn years sit on the left, below EUR 14m. Only a thin tail reaches past the marker. In 1 year out of 200 the loss is above EUR 20.8m. In the other 199 it is below.
Common misreadings.
- The bar heights show the 22% of years with a loss, not all years. The missing 78% is the point, not a gap.
- The right end of the axis is not the worst case. A few years can be larger than the last bar.
- The shape changes a little with each engine run, because each run draws different years.
What to do next. If the tail is long and the marker is far to the right, ask what drives the large years. Often it is the loss size of one event. Check the curve below.
One loss

In German the tab calls it Einzelschaden.
What it shows. The size of a single loss when it happens. It ignores how often it happens.
How to read it. The horizontal axis is the size of one loss (here up to EUR 31.7m). The height of the curve shows how common that size is. The dashed line marks the typical loss: half of all losses are smaller (here EUR 3.3m). The dotted line marks the bad loss: only 1 loss in 20 is larger (here EUR 14m).
Worked example. If the ransomware outage happens, half of the time it costs less than EUR 3.3m. In 1 case out of 20 it costs more than EUR 14m. The curve falls slowly to the right: large losses are rare but possible.
Common misreadings.
- The area under the curve is not money. Read the position on the axis, not the height.
- The bad loss of one event (EUR 14m) is not the 1 in 20 years loss of the four figures (EUR 7.4m). One counts events, the other counts years, and most years have no event.
What to do next. If the curve does not match your experience, go back to Loss size and change the typical and the bad loss. A curve that stays flat and wide means you were unsure. Say so under How sure are you?.
Risk model charts
A risk with a risk model shows A year in total like above, and three more charts on the Analysis tab. They show the last run of the model.
What moves the result
What it shows. For each block that drives the result, the average yearly loss in the 10% of simulated years where that block was lowest and in the 10% where it was highest.
How to read it. Each row is one block. The bar runs from the average loss when the block is low to the average loss when it is high, and the text at the end of the row gives both. A bar in a second color marks a block whose higher values lower the loss. The dashed line is the average loss over all years. Blocks with the widest bar come first. A wide bar means the result reacts strongly to that block.
Common misreadings.
- A wide bar does not say the block is likely to be high. It says what happens if it is.
- A block that is not in the chart does not influence the result, or has no variation.
What to do next. Spend your effort on the first rows. Check the estimates of those blocks with a second person, or look for a control that lowers them.
Share of the spread
What it shows. How much of the swing in the yearly loss each block explains. The shares add up to 100%.
How to read it. A longer bar means more of the up and down of the yearly loss follows that block. It ranks the blocks like What moves the result does, but compares the blocks with each other instead of showing money.
Common misreadings. The share is not a share of the loss. A block with 60% explains most of the swing, not 60% of the money.
Is the average stable?
What it shows. The average yearly loss after more and more simulated years, with a lower and an upper bound that give its margin of error.
How to read it. On the left, with few years, the lines are far apart. If the three lines flatten and run together towards the right, the run was long enough and the expected downside is reliable. If the lines still move at the right edge, the figure is unsettled.
Common misreadings. A flat line does not prove the estimates are right. It only shows that enough years were simulated for these estimates.
Risk capacity charts
These are on the Risk capacity page. See Capacity and appetite.
The verdict line

What it shows. One sentence that compares a bad year with your capacity and your appetite. The colour of the box follows the result. The words carry the same message, so you never depend on colour.
Worked example. "At 99.5% confidence, a bad year costs EUR 110.5m, 61% of capacity. This is above your appetite of 60%." The box is red because 110.5 is more than the appetite limit of EUR 108m. The second line says that a correlation of 0.20 is applied.
Common misreadings.
- "Within your appetite" does not mean safe. It means below the line the board accepted.
- The sentence changes when you change the confidence level, the stress scenario or the correlation under What if. Compare numbers only with the same settings.
What to do next. Amber means little room. Look at the drivers table to see which risks to treat first. If the wording is "Above appetite", take it to the board, see Risk acceptance.
Loss distribution

What it shows. The histogram of the yearly loss of all quantified open risks together, over 20,000 simulated years.
How to read it. The horizontal axis is the total loss in a year. A tall bar means many simulated years. The dashed lines are markers: Average year, Bad year, Appetite and Risk capacity. A marker appears only when it falls inside the drawn range, so the Risk capacity marker is missing here: EUR 180m is further right than the chart goes. The note below the chart says how many years have no loss and how many lose more than the right edge.
Worked example. The average year costs EUR 18.7m. The bad year at 99.5% is EUR 110.5m. The appetite limit is EUR 108m, so the bad year is just right of it. The note says: "0.1% of years lose more than EUR 164.1m and are not drawn."
Common misreadings.
- The average year sits near the tall bars, but the bad year is more than five times larger. Do not plan with the average.
- The missing capacity marker does not mean capacity is not set. It is outside the chart.
- Two markers close together, here bad year and appetite, are easy to confuse. Read the labels.
What to do next. Move the Confidence level and Correlation under What if and watch the bad year marker move. Use the figure that your board agreed on.
Risk capacity used

What it shows. The bad year as a share of your risk capacity.
How to read it. The coloured arc and the bar fill up to the share used: 61%. The dark tick marks the appetite: 60% of EUR 180m is EUR 108m. Colour: green below 85% of the appetite, amber between that and the appetite, red above. At 100% the capacity is used up.
Worked example. The bad year costs EUR 110.5m of EUR 180m capacity. The arc is red and ends just past the tick, so the bad year is above the appetite limit.
Common misreadings.
- The tick is the appetite, not the capacity. The capacity is the end of the arc.
- A green arc means the bad year at the chosen confidence level fits. A worse year than the 1 in 200 year can still happen.
What to do next. If the arc is close to the tick, check which risks you plan to take on next year before you add new exposure.
Largest contributors to a bad year

What it shows. The 10 risks that contribute most to the loss in bad years.
How to read it. Average loss per year is the usual cost of the risk. In a bad year is its average loss in the simulated years beyond the confidence level. Share of bad year is that loss divided by the total. Select a risk to open it.
Worked example. R-017 costs EUR 864k per year on average, but EUR 21m in a bad year. That is 14% of the bad year. R-001 costs EUR 1.2m on average and EUR 9.2m in a bad year, 6%.
Common misreadings.
- The ranking is not the ranking by expected downside. A risk with a small average and a large tail can rank high.
- The shares of the top 10 do not add up to 100%. The other risks make up the rest.
What to do next. Open the top risk. Check its loss model, its controls and whether an action reduces the tail. See Risks.
Correlated and independent view

What it shows. The same portfolio run twice. In Losses move together bad events tend to strike together. In Losses are independent they do not.
How to read it. Each side shows the bad year, the average of the worst years and the average year. The bad year of the left side is EUR 110.5m. On the right it is EUR 69.1m. The Diversification effect is the difference: EUR 41.4m, which is 37.5% of the correlated bad year.
Worked example. If you treated the risks as independent, you would plan for a bad year of EUR 69.1m. With shared causes such as one supply chain or one cyber event, the bad year is EUR 110.5m. The independent view would understate it by EUR 41.4m.
Common misreadings.
- The independent view is not the safe view. It is the optimistic one.
- The average year hardly changes between the two sides. Small differences come from the random draws. Correlation moves the tail, not the average.
- The panel is closed by default and needs at least two quantified risks. If you have set no correlation, the left side uses 20% and says so.
What to do next. Set a correlation that fits your business under What if. Ask your board which view it wants to see in the report.
Risk heat map

What it shows. Where your open risks sit by likelihood and impact.
How to read it. The vertical axis is Likelihood from 1 to 5. The horizontal axis is Impact from 1 to 5. The number in a cell is how many risks sit there. Empty cells show no number. The colour is the band of the cell. Below the matrix, five counts show how many risks fall into Critical, High, Elevated, Moderate and Low. The toggle Residual or Inherent changes the basis: with controls, or without.
Worked example. 33 open risks. Two sit at likelihood 4 and impact 4, one at likelihood 3 and impact 5. Those three are the High ones. 28 are Elevated, 2 are Moderate. Eight risks sit at likelihood 3 and impact 3.
Common misreadings.
- The heat map shows ratings, not money. Two risks in one cell can differ a lot in expected downside. Use Quantification for that.
- A cell is a count, not a score. The same colour can hold one risk or twenty.
- Switching to Inherent shows the picture before controls. A big gap between the two views means you rely heavily on your controls.
What to do next. Select a cell to open the register filtered to those risks. Start with the High and Critical counts.
Indicator trend

What it shows. The values of a key risk indicator over time with the green, amber and red zones behind them. See Indicators.
How to read it. The horizontal axis is time, with the first and the last date at the bottom. The vertical axis is the value. The dashed lines are the thresholds: Warning and Breach. The zones behind the line show where a value counts as fine, as a warning or as a breach. Each dot has the colour of its zone. The big dot at the right is the latest value with its number. For an indicator where higher is worse, red is at the top. For one where lower is worse, the zones are flipped.
Worked example. "Days since last OT backup restore test". The warning is at 180 days, the breach at 270. The line rises by about the same step each month. It crossed 180 in the middle of the year and 270 a few months later. The latest value is 360 days on 12 Nov 2026.
Common misreadings.
- The chart has no zero line. The axis starts near the lowest value, so a small change can look steep.
- One red dot is a data point, not a trend. Look at the direction of the last few points.
- A value inside the green zone can still be moving towards amber.
What to do next. For a breach, record why and link an action to the risk. For a trend moving towards amber, talk to the owner before it crosses.
Control test plan bar

What it shows. For each department how many controls have been tested in the chosen period and how the tests went. See Control tests.
How to read it. The bar is the full set of controls of the department. Each coloured part is the share of controls in one state. The legend below the bar gives the counts: Passed, Partly passed, Failed, Due and Overdue. The list shows each control with its owner, the date of the next test and its state. Use This quarter or This year to change the period, and Key controls only to narrow it.
Worked example. Finance has 5 controls: 3 passed, 1 due and 1 overdue. The green part is three fifths of the bar, the grey part and the orange part one fifth each. The overdue control is Privacy impact assessments, which was due on 11 Oct 2026.
Common misreadings.
- A full green bar means every control in the period passed. It does not mean the controls are well designed. Design is rated separately.
- Due is not a failure. It means the test falls in the period and has not happened yet.
- A short bar is a department with few controls, not a department with a problem.
What to do next. Start with Overdue. Open the control and record the test. For Failed and Partly passed, check that an action exists.
Charts in reports and the cockpit
Board readers see the same figures in the executive cockpit and in the report. See Executive cockpit and Data blocks.
The verdict banner

What it shows. The status of your risk position in one line, with the three numbers a board member asks for first.
How to read it. On the left are the status with an icon and the sentence. On the right are Bad year (99.5%), Risk capacity used with a bar and Risks above appetite. The tick on the bar is the appetite.
Worked example. "Above appetite". A bad year costs EUR 110.5m, 61% of EUR 180m capacity, with an appetite of 60%. 13 of 35 risks are above their own appetite.
Common misreadings.
- The bad year here follows the portfolio. The Risks above appetite count looks at single risks against the appetite of their category. Both can be true: the portfolio is within appetite while 13 risks are above theirs.
- Status is shown with a word and an icon. A calm colour does not mean no action is needed.
What to do next. If the banner says "Above appetite" or "Above capacity", prepare the decision for the board. See the wording table in Capacity and appetite.
The capacity block in a report

What it shows. The capacity page in short form: a reading line, the gauge, where a bad year comes from by category and the single risks behind it.
How to read it. The line at the top states the result in words. The gauge shows the share of capacity used, the tick is the appetite. On the right, the bars give the share of each category in the loss in bad years: Strategic 29%, Counterparty 23%, Cyber 11%. Below, the single risks with their mean loss in a bad year, for example R-017 with EUR 21m, 14%. The caption names capacity, appetite, confidence and the stress scenario.
Common misreadings.
- The category shares are shares of the loss in bad years, not of the expected downside.
- The caption matters: a report with another confidence level or a stress scenario is not comparable with this one.
What to do next. Check the caption before you compare two reports. A submitted report keeps its numbers, a live report changes with your data. See Approval and snapshot.
Risk models
Quantify a risk with a model of blocks instead of a single estimate, read the expected downside, the 1 in 200 year loss and the charts of a run, and see what the model changes elsewhere in the app.
Locations
Your sites on a map with their expected downside, asset value, staff, open risks and incidents.